Hydrogen Hub Masterplanning | Argyll, Scotland

CLIENT:  GREENPOWER

Hydrogen Hub Masterplanning & Consenting
Hydrogen Hub Masterplanning
Hydrogen Hub Engineering & Environmental Consultants
Hydrogen IKM Consulting
Hydrogen IKM Consulting
Hydrogen IKM Consulting
Hydrogen IKM Consulting

IKM Consulting first engaged with GreenPower Hydrogen in October 2022 and evidenced the skills, experience and technical capability to deliver our first green hydrogen scheme. Their multi-disciplinary team joined us on a learning journey which has resulted in an innovative scheme which we’re happy to have tested by Argyll and Bute Council while we map out our future steps towards commencement of construction and commissioning of Argyll Hydrogen Hub.”

GreenPower

Project Aims

GreenPower Hydrogen aspires to augment their existing sustainable energy (wind) portfolio with a green hydrogen production, storage and dispensing facility. GreenPower Hydrogen identified the site at Plot 3 & 4, Glengallan Road, Glenshellach Industrial Estate, Oban and entered into missives with Highland and Islands Enterprise.

The opportunities for wholesale supply of green hydrogen to the immediate area includes commercial road users such as hauliers and public service vehicle operators and energy infusion to the local independent gas network. Longer term opportunities include supplying alternative transport means and delivery to large-scale users by pipeline (with bunkering within customer’s premises) as opposed to by road-going container. Road users will have hydrogen fuel dispensed into fuel cells in an arrangement like a traditional filling station.

GreenPower Hydrogen appointed IKM Consulting because of their more than 25 years’ experience delivering complex engineering solutions within high-hazard, COMAH and DSEAR environments. The scope of the project includes:

  • Development of a site layout, considering storage volumes, production rates and processes, existing site constraints and internal configuration;
  • Utilising the agreed layout to identify the technical deliverables required for a valid planning application and production of the same; and
  • Submission of an application for detailed planning permission to Argyll & Bute Council and an application for Hazardous Substances Consent to the Health and Safety Executive via Argyll & Bute Council.

Strategy Employed

IKM Consulting formed a team with expertise in industrial site masterplanning and in green hydrogen production. Their team was managed internally. Its initial objectives included:

  • To thoroughly understand their client’s aspirations,
  • To formalise a project team structure to ensure effective communication between all members, and
  • To refamiliarise themselves with the latest guidance and the regulatory framework for green hydrogen assets

Additionally, IKM Consulting’s design team considered the strengths and weaknesses (relative to the project) of currently available electrolyser types and made recommendations to their client regarding the number of electrolysers, ancillary plant, and their spatial distribution across the site.

A principal challenge in delivering the scheme was the size, shape and existing features surrounding the site. As illustrated in the graphic below, these included the existing turning head, existing watercourses and the site levels relative to the public road.

Considering the capital cost of delivering the scheme, IKM Consulting satisfied themselves that an efficient and effective site layout was possible without major disruption to the site’s existing features. The site layout is illustrated in the supporting imagery.

The team was also challenged to predict the demand for green hydrogen with enough accuracy to (1) avoid proposing a scheme whose capacity would quickly be exceeded by demand, and (2) to ensure proper positioning within the tiers specified in the COMAH guidelines.

IKM Consulting evaluated the demand for gas in the local network using data supplied by the network operator. This included a review of annual, monthly and daily demands and peaks, and seasonal and daily fluctuations. IKM Consulting also considered:

  • The effects of a volume-equivalent or energy-equivalent percentage infusion into the gas network,
  • Appropriate volumes to be stored for an unplanned 5-day or 7-day production shutdown, and
  • The impact of varying numbers of green hydrogen fuelled HGV’s and PSV’s on production rates and buffer volumes and pressures

Our assessment allowed the number of electrolysers, the number and capacity of vessels and containers, and their varying pressures to be determined. It also allowed the duty/ standby operational hours for each electrolyser to be quantified. In turn, this allowed GreenPower Hydrogen to include these factors in their operational cost modelling.

Green hydrogen is generally defined as ‘hydrogen, the production of which is powered solely by renewable energy’. GreenPower Hydrogen’s Argyll Hydrogen Hub is meeting this criterion using power from wind farm assets in the area.
IKM Consulting has, however, investigated if greater efficiency and sustainability can be embedded into the production process, and two areas were identified:

WATER

As opposed to depleting already stretched water company resources and risking a detrimental effect on levels of service to existing water company customers, the scheme is testing whether water may be drawn from a watercourse, appropriately treated and used from green hydrogen production.
Similarly, as the detailed design progresses, consideration will be given to re-use of water that is ejected from the production process. Early indications suggest this may be used without negative effects for non-potable water purposes within the site and management building.

OXYGEN

Oxygen is a principal by-product of green hydrogen production. Within the Oban area, Oxygen is in high demand for use in fish- and shellfish-farming. Our scheme includes proposals to capture the oxygen by-product and make it available in cryogenic form to users using road-going containers.

IKM Consulting’s multi-disciplinary team delivered the following services:

  • Design team management/ Project coordination
  • Principal Designer
  • Civil and Structural Engineering
  • Architectural Masterplanning
  • Process and Mechanical, Electrical, Control and Instrumentation Design
  • Environmental and Ecological Appraisal

Our deliverables supported an application for planning permission and for Hazardous Substances Consent.
Additionally, our deliverables at stages throughout the design phase and our final deliverables supported GreenPower Hydrogen in formulating their operational approach to Argyll Hydrogen Hub.

Our solution delivers the familiarity of an everyday filling station with the enhanced safety and security of a segregated green hydrogen production plant. It is inherently flexible to accommodate advances in technology throughout the design phase and can accommodate spatial changes as safety is reviewed at each project milestone.