Project Aims
As a leading operator of chemical storage and distribution facilities, demonstrating compliance with HSE guidance for secondary containment and the prevention of groundwater pollution from solvents were top priorities for our client. Our team proposed a phased management and delivery strategy to demonstrate that below-ground drainage assets were compliant. Our inspections highlighted where remedial works would be required, and recommendations for repairs, refurbishment or replacement options.
Strategy Employed
Elements within the drainage systems were identified as critical to the efficiency and compliance of the overall system including:
- Pumping chamber pits
- Attenuation tanks
IKM completed the following scope of works:
- Desk Study
- Site Walkover
- Inspection Enabling Works
- Inspection Works
- Reporting & Recommendations
Read the case study for a full overview of the programme detail: Drainage Asset Management Strategy