Case Study: Offshore Control Room.
Location: Bruce Oil Platform.
Download:
offshore-control-room.pdf
Brief
The existing Control Room on the Bruce Platform was a typical example of an old Control Room design, with little regard for ‘Human Factors' and the Operator Environment. During a controls re-instrumentation project, the Client identified that the opportunity should be taken to optimise the Control Room environment.
IKM were employed to review the current layout and propose a scheme design and ‘Best Practice' report.
Solution
After undertaking the BOSIET (Basic Offshore Safety Induction & Emergency Training) course, we visited the Platform for an initial survey and discussions with the operators.
The final solution addressed reduction in operator distractions through a revised layout design and the provision of a flexible emergency response/ handover area. It also focused on acoustics, lighting, finishes and fittings.
News.
State of the art recycling facility for Glasgow IKM...read more.
IKM Consulting sets sail for Port Edgar Marina as new...read more.
New Scots-Irish partnership targets environmental sector: IKM Consulting...read more.
IKM Consulting appointed to £7M school project: IKM Consulting, has...read more.