Case Study: IPPC Risk Assessment.
Location: Refinery Tank Farm Bunds.
Download:
ippc-risk-assessment.pdf
Brief
IKM Consulting was requested to prepare a risk assessment method for assessing the integrity of tank bund liners at the Grangemouth refinery in Scotland. This was required to form part of the BREF notes for IPPC Legislation on behalf of the Energy Institute.
Solution
IKM produced a series of hazard matrix spreadsheets for over 300 tanks. These incorporated information on the different products stored and various geological/hydrogeological risk parameters. In addition inspections were undertaken of all the existing bund liners and external conditions of the tanks.
This enabled IKM to produce a screening risk assessment for all the product tanks.
Outcome
IKM produced a final risk assessment report demonstrating that further assessment was required for less than 5% of the tanks considered.
News.
State of the art recycling facility for Glasgow IKM...read more.
IKM Consulting sets sail for Port Edgar Marina as new...read more.
New Scots-Irish partnership targets environmental sector: IKM Consulting...read more.
IKM Consulting appointed to £7M school project: IKM Consulting, has...read more.