Case Study: Destruct Engineering Power Station.
Location: Kincardine.
Download:
destruct-engineering-power-station.pdf
Brief
IKM were appointed to provide a structural assessment of the condemned Kincardine Power Station. The safest way to demolish this complex structure was explosively.
Solution
IKM carried out a detailed structural assessment of the complex building. Calculations on the amount of pre-weakening that would be required were made.
Outcome
The staged demolition to remove the turbine house, economisers, silos and finally the boilers in the main structure, was successfully completed.