Case Study: Assessment of Occupied Buildings.
Location: Various.
Download:
assessment-of-occupied-buildings.pdf
Brief
IKM Consulting Ltd have undertaken the assessment of blast safety at occupied buildings within a number of Petro-Chemical sites.
Solution
Assessments have entailed the following:
- Calculation of over-pressures, and thermal contour plans.
- Identification of usage and effective population.
- Calculation of individual and societal risk of each location.
- An assessment of building condition and vulnerable elements such as glazing, cladding and brickwork.
Preparation of a ranking and assessment matrix which identifies:
- Workshop location.
- Occupant vulnerability.
- Vulnerable features.
- Cost benefit analysis.
- Cost of upgrading.
- Recommendations.
Outcome
Using this state of the art analysis, a number of high value buildings have had their effective lives considerably lengthened, saving our clients millions of pounds.
News.
IKM Consulting appointed to £7M school project Environmental and...read more.
Talking Business In The Sahara: The ability to speak the...read more.
IKM Glasgow Move: The Glasgow operation of IKM has moved to larger...read more.
IKM Software Adds New Dimension With technology playing an increasingly...read more.

